Comments on: Killingworth Road Gas Works 27-31 March 2017 https://www.spaceforgosforth.com/gasworksmarch2017/ Sun, 26 Mar 2017 18:51:17 +0000 hourly 1 https://wordpress.org/?v=6.5.2 By: Dave H https://www.spaceforgosforth.com/gasworksmarch2017/#comment-5795 Sun, 26 Mar 2017 18:51:17 +0000 https://spaceforgosforth.com/?p=1962#comment-5795 Just cycling from Gosforth is as fast as Metro or bus, and possibly faster as you cut the waiting allowances and go door to door, plus of course it is likely that you can get past the works along access that remains for pedestrian traffic. Why wasn’t this suggested? Unfortunately at this notice there is no opportunity to suggest a local offer of a rebirth of Scratchbikes as these would be brilliant solution, and might also be an option for when parts of the Metro are closed for track renewals.

Have you reviewed the road closure order(s) These are often thoughtlessly drafted with a sole focus on motor traffic either assuming or ignoring the detail that pedestrian traffic will not make 2 mile diversion for a 200 yard closure, and will either march through the work-site or make an informal and often less safe arrangement without the legally specified arrangements for providing a pedestrian route around the work-site. Personal experience when I was arranging a bridge replacement saw the official arrangements suggesting a 6 mile diversion along an A-road and back lanes almost all of it without footways. I had to propose the pedestrian and cycling diversion (in the very middle of the village where people went under this bridge to get to the shops!)

So check out the plans for signage of the works (Chapter 8) and the arrangements for pedestrian traffic – including prams and wheelchairs, and at least 1.5m wide. Likewise for cycling, although perhaps with some parts where cyclists may have to walk. Then make sure this is delivered, as prescribed by the book.

]]>